How to price a public tender without leaving money on the table
How to price a public tender: build your costs, read the price/quality weighting, avoid abnormally low offers and manage indexation and currency risk.
Pricing is where many good proposals are won or lost. Price too high and a strong technical offer is beaten by a cheaper competitor. Price too low and you either win a contract that loses money for years, or your offer is flagged as abnormally low and questioned. In between, there is often margin you could have kept if you had understood how the price would be scored.
This guide walks through a practical method: build your costs properly, understand the evaluation formula, position your price, and protect yourself against the risks that turn a winning bid into a bad contract.
Step 1: build your costs from the bottom up
Start from what it will actually cost you to deliver, not from what you think the buyer will pay. A solid cost build-up includes:
- Direct labor: hours or days per role, multiplied by fully loaded rates (salary, social charges, benefits).
- Materials, equipment and licenses, including spares, delivery and installation.
- Subcontractors and partners, with their own quotes, not estimates.
- Travel and logistics, especially for contracts in other regions or countries.
- Project management and quality assurance, which are easy to forget and always needed.
- Mobilization and transition: onboarding staff, setting up tools, taking over from an incumbent.
- Financial costs: bid bonds, performance guarantees, insurance, and the cost of financing payment delays.
- Overheads: a fair share of your fixed costs.
- Contingency for identified risks, sized to their likelihood and impact.
- Margin, as a separate, visible line in your internal model.
Keep contingency and margin separate. When you later decide to sharpen the price, you want to know whether you are cutting profit or cutting protection against real risks.
Step 2: understand how price will be scored
Read the evaluation criteria before you set any number. Three elements matter.
The price/quality weighting
A tender awarded on lowest price alone is a pure price competition once you are compliant. A tender weighted, for example, 70% quality and 30% price rewards a stronger technical offer and gives you room to price at a sustainable level. Know which game you are playing.
The price scoring formula
Buyers convert prices into points in different ways, and the formula changes your optimal strategy. Two common approaches:
| Formula type | How it works | What it means for you |
|---|---|---|
| Proportional to the lowest price | Score = max points x (lowest price / your price) | Each price gap costs relatively few points. A strong quality score can often compensate a higher price. |
| Linear between lowest and highest, or against a reference | Points drop in a straight line as price rises | Small price differences can create large point gaps. Price matters more than the weighting suggests. |
A worked example (illustrative numbers): price is worth 30 points and scored proportionally. The lowest bid is 900,000. At 1,000,000 you score 30 x 0.9 = 27 points. You lose 3 points on price. If your technical offer earns 5 more quality points than the cheapest bidder, you still win despite being 11% more expensive. Doing this arithmetic before pricing tells you how much a price cut is really worth.
What exactly is evaluated
Check whether the evaluated price is the total contract value, a weighted basket of unit rates, the first year only, or a lifecycle cost including maintenance and consumables. Buyers sometimes evaluate on estimated quantities that differ from what they will actually order. Price the items that carry the most weight in the evaluation with particular care.
Step 3: position your price
Once you know your cost and the scoring mechanism, decide where to land:
- Use market intelligence. Award notices often publish the winning price and sometimes the number of bids or the price range. Look at previous awards for the same buyer and similar contracts.
- Consider the published budget or estimated value, when available. Bids above it may be rejected or trigger cancellation in some systems.
- Identify the likely competitors and their usual pricing behavior.
- Decide your strategic intent. Is this a must-win reference where you accept a thin margin, or a contract that must pay for itself?
Avoid the reflex of cutting margin to the bone on every bid. Cutting price is often less effective than earning a few more quality points, and it is much harder to recover later.
Abnormally low tenders
Many procurement systems allow or require buyers to investigate offers that look abnormally low compared with other bids or the estimated value. The buyer typically asks the bidder to justify its price, and may reject the offer if the explanation is not convincing, for example when it would not respect labor, social or environmental obligations.
If your price is aggressive, prepare for this in advance:
- Keep a clear, documented cost breakdown you can share.
- Be ready to explain the source of your advantage: existing equipment, proprietary technology, local staff, economies of scale, an already mobilized team.
- Make sure your labor costs respect applicable wage and collective agreement rules.
A low price is not a problem in itself. An unexplained low price is.
Respect the price template
Price schedules (bills of quantities, price forms, rate cards) are one of the most frequent causes of rejection. Treat them as a compliance document:
- Fill in every line. Leaving a line blank or writing "included" may not be accepted unless the template allows it.
- Do not add, delete or reword lines.
- Check arithmetic, rounding rules and totals. Understand how the buyer will treat discrepancies between unit prices and totals.
- Use the required currency, tax treatment (with or without VAT or sales tax) and number of decimals.
- Make sure the price in the form matches the price in any cover letter or summary.
- Avoid conditions or reservations on price unless variants are explicitly allowed.
Pricing risks to cover
Indexation and price revision
For multi-year contracts, check whether the contract includes a price revision clause, which index it uses and how often it applies. If prices are fixed for the full term, your contingency must cover inflation on labor, energy and materials. If there is an index, check that it actually reflects your cost structure.
Currency
International tenders, including those funded by development banks, may require pricing in a specific currency, or allow part of the price in foreign currency and part in local currency. If your costs and your revenue are in different currencies, you carry exchange rate risk for the whole contract. Consider hedging, local sourcing, or using the split-currency option when the rules allow it. See development bank tenders for the particularities of those procedures.
Volumes and scope
Framework agreements and unit-rate contracts often come with estimated, non-binding quantities. Do not price on the assumption that the maximum volume will materialize. Check minimum commitments, if any.
Payment terms
Long payment periods, milestone payments that lag behind your costs, and retention money all have a financing cost. Include it.
Penalties and liability
Service level penalties and liquidated damages can erode margin quickly. Estimate a realistic level of penalties and price accordingly.
Pricing checklist before submission
- Is every cost line built from real quotes, rates and quantities?
- Are contingency and margin separated and justified?
- Have you modeled your score under the buyer's price formula against likely competitor prices?
- Have you checked previous award prices for similar contracts?
- Could your price be considered abnormally low, and is a justification ready?
- Is the price template complete, unmodified and arithmetically correct?
- Are currency, tax treatment and indexation handled as required?
- Are guarantees, insurance, payment delays and penalties priced in?
- Has someone with commercial authority signed off the final price?
Good pricing is not about being the cheapest. It is about knowing exactly what each point costs you and choosing where to compete. Combine it with a disciplined bid/no-bid decision, and you will spend less time on races you cannot win profitably.



