Building renovation works at Stolnik substation, Bulgaria
The Network Operation Region - Sofia Region requires construction and installation works for the renovation of the Pumping Station and Workshop buildings at the Stolnik substation.
The project includes facade repairs, such as plastering, insulation, and window replacement, as well as roof repairs involving waterproofing, drainage systems, and structural insulation. Interior works for the workshop include wall finishing and the installation of frost-resistant granite tiles. The scope covers 447 square meters of workshop facade, 481 square meters of workshop roofing, 83 square meters of pumping station facade, and 35 square meters of pumping station roofing.
Summary written in English from the official notice, which always prevails. Check the tender documents before bidding.