Sludge Dewatering and Thickening Plant Construction for Ahlbachgruppe, Germany
BayernGrund GmbH is seeking a contractor for the construction of a sludge dewatering and excess sludge thickening plant as part of a new wastewater treatment facility.
The scope includes the supply and installation of screw presses, conveyor technology, sludge storage, flocculant handling stations, and associated instrumentation and control systems. The contractor is responsible for commissioning and performance testing. The project requires coordination with other ongoing site works, including pipeline and road construction. The contractor must ensure that the existing wastewater treatment plant operations remain functional and undisturbed throughout the installation process.
Summary written in English from the official notice, which always prevails. Check the tender documents before bidding.