Foul-water piping construction work in Tielt-Winge
Aquafin NV is seeking contractors for the construction of connecting sewers in Kiezegem, Tielt-Winge. The project includes the installation of 4,596 linear meters of piping with diameters ranging from 250 to 1,200 millimeters, as well as 7 linear meters of prefabricated reinforced concrete box culverts.
Additional works involve the construction of a buffer basin, winter beds, 23 reinforced concrete structures, a pumping station, and nine headwalls. The scope also covers pressure pipes, mini-pumping stations, watercourse profiling, road reconstruction, new road construction, landscaping, and temporary water management systems including temporary pressure piping.
Summary written in English from the official notice, which always prevails. Check the tender documents before bidding.